Skip to content

Beta. Report an error on the contact form

QALPrep

Draft outline

Category C · Right-of-way

A reading map for the Right-of-Way exam on both the Qualified Applicator License and the Qualified Applicator Certificate. The topic list is the one DPR prints in the knowledge expectations. Where that PDF only tells you to know something, this page does not invent the detail.

Named edition: the 2013 right-of-way manual by S.H. Dreistadt (UC ANR publication 3336), plus the 2016 safe-use book. DPR suggested study list, Rev. 05/25. Last checked: 10/15/2026.

What DPR calls this exam

The knowledge expectations are headed “C – Right-of-Way Pest Control Category” and cover the Qualified Applicator Certificate and the Qualified Applicator License. The PDF footer says September 2014 and “Page 1 of 2.” The suggested study list calls the exam Right-of-Way Pest Control (Category C). The QAC and QAL packets list C as Right-of-Way.

What to read

  • Knowledge Expectations: Right-of-Way (Category C). The PDF points the reading at Dreistadt’s right-of-way manual from 2013, and it says knowing the expectations should prepare you for the exam.
  • That manual is ordered through the UC ANR catalog. The study list also prints a phone number for the same catalog.
  • The 2016 UC IPM safe-use book is ordered the same way. The study list pairs it with this category.

Topics the expectations name

  • Chapter 2, pests and problem diagnosis: major pest types, life cycles and life stages, and abiotic damage that can look like pest damage.
  • Chapter 3, integrated pest management: methods for major vertebrate pests and weeds, including what each method does well and where it falls short.
  • On labels and exposure, chapter 4: parts of a label, toxicity, how people are exposed, acute effects and symptoms, first aid, and protecting people and the environment.
  • Chapter 5, pesticides and their effective use: active ingredients and formulations, selectivity, and legal, safe handling through transport, mixing, loading, application, storage, and disposal. Also off-site movement and how to avoid it.
  • Chapter 6, application equipment and calibration: equipment that fits the work site, nozzles, calibration, and figuring the amount for a measured area.
  • Corridor sites, chapter 10: types of sites and the traits that affect management, including terrain, land use, and ownership; nearby areas and whether people are likely to be there; and management goals that can differ by site.
  • Chapter 11, right-of-way pest management: plant types and life cycles, herbicide methods and methods that are not herbicides, pesticide types, and places where the corridor runs beside or across surface water, past a school, or through a Ground Water Protection Area, plus other places that need extra care. You are also expected to know whether a local rule applies and whom to ask before you apply.

To confirm

  • To confirm. The expectations tell you to name the types of right-of-way sites. They do not print that list. Forest and Right-of-Way Pest Control (2013) is still needed, and the questions on this site have not been checked against it.
  • To confirm. The expectations and the study list do not print a sentence defining which jobs or properties fall under Category C. Check DPR’s current licensing pages for that scope.

The same topic list, with a note on what is still missing, is on the Category C practice page. Those 19 questions are preliminary and stay out of the default drill. Also on this site: Category B, Category D, and the QAC path.